Landlord electrical safety certificates in Sheffield EICRs.
From £119.
Landlord electrical safety certificates for student lets, HMOs and family homes across Sheffield, S1–S36. The test is an EICR, from £119 inc VAT for a flat or small house.
Check us before you book
Three promises.
In writing, for every property you send.
- 5 daysEICR carried out. We book the tenants ourselves.
- 24 hrsPDF report with photos of every C1 and C2, plus a fixed remedial price.
- 14 daysRemedials done and certified within 14 days of your go-ahead. Approve promptly and you keep half the legal 28 days spare.
Rather talk first? Book a 5-minute call with Mo
No chasing.
No drift past day 28.
The test itself is the easy part. The time goes on waiting for a slot, getting hold of the paperwork and getting remedials finished. That's the part we take off your desk.
Up to 5 working days
Tested.
We book access with the tenant directly and send you the schedule. Your team doesn't chase anyone.
Within 24 hours
Reported.
The PDF certificate, photos of every C1 and C2, and a fixed remedial price in one email, ready to forward.
You approve
Your go-ahead.
Within 14 days of your go-ahead
Fixed.
Remedials done and certified within 14 days of your go-ahead, with written confirmation for the tenant and the council if they ask.
28 days The law: remedials within 28 days of the inspection, or sooner if the report says so
Approve promptly and you keep half the legal 28 days spare. Not to scale.
Published prices.
No theatre in the quote.
All guide prices include VAT at 20%. Remedials are quoted at a fixed price with the report, before any work starts.
| Service | Guide price |
|---|---|
| Landlord EICRTypical flat or small house. | From £119 inc VAT |
| Landlord EICR, larger houses and HMOsSend the room count. | Quoted on circuit count |
| Agent rate: 10+ EICRs a yearWhen 3 or more properties are booked for the same day or the same postcode cluster | £10 off every EICR |
| Emergency lighting (HMOs and blocks) | From £216 inc VAT |
| Consumer unit upgradeConsumer unit replacement in Sheffield | From £539 inc VAT (testing not included) |
| Tenant emergency call-out | From £144 inc VAT |
“Remedial work on a 4 bedroom house. Prompt, straightforward, happy with the pricing.”
Qasem Al-khameri · Google · 4.9 from 63 reviews
One box.
Everything you need.
Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020.
- ✓An EICR at least every 5 years, and before a new tenancy if it has lapsed
- ✓Tenants get a copy within 28 days of the inspection
- ✓Remedials done within 28 days, or sooner if the report says so
- ✓Councils can fine up to £30,000 per breach
A summary, not legal advice. HMOs may carry extra licence conditions from Sheffield City Council.
Any size of list in Sheffield (S1–S36). In Rotherham, Barnsley and Chesterfield we book days of 3 or more properties. Elsewhere in the UK, only programmes of £2,000 ex VAT or more per trip.
Send the list.
We do the rest.
- Send the list.Addresses, tenant contacts and due dates. A spreadsheet is fine.
- We book the tenants.Access arranged directly, with the schedule sent to you.
- Test and report.The PDF lands within 24 hours, with photos and a fixed remedial price.
- You approve, we fix.Remedials done and certified within 14 days of your go-ahead.
- We remind you.Every property is logged, and you hear from us before it's due again.
Student lets need an EICR.
We already work that street.
One property or fifty. You'll get a schedule and a price back the same working day.
One property and want a slot now? Use the booking diary.
Landlord EICR questions.
Which landlord electrical certificate do I need?
An Electrical Installation Condition Report (EICR). It is what most people mean by a landlord electrical safety certificate. Ours start from £119 inc VAT for a flat or small house; larger properties and HMOs are priced by the number of circuits. You get the report within 24 hours of the test. Not renting the property out? See EICR in Sheffield.
How often does a rented property need an EICR?
In England, private landlords need an EICR at least every five years, or sooner if the report says so. New tenants must be given a copy before they move in, and existing tenants within 28 days of the inspection. Remedial work the report requires must be finished within 28 days of the inspection, or sooner if the report says so. We complete remedials within 14 days of your go-ahead, so approve the quote promptly.
Do you handle tenant access?
Yes. Send the tenant's contact details and we'll arrange a time directly. If a tenant won't give access, you'll hear the same day, and every attempt is logged.
What if the EICR comes back unsatisfactory?
A fixed-price remedial quote comes with the report. Once you approve it, remedials are done within 14 days of your go-ahead, and the completion certificate is sent to you, ready for the tenant and the council. The legal 28 days run from the inspection date, so the sooner you approve, the more time is spare. What the C1, C2, C3 and FI codes on a report mean: see EICR in Sheffield.
Do you cover HMOs and commercial buildings?
Yes: HMOs, blocks, shops and offices, including emergency lighting and 3-phase. Larger buildings are quoted on circuit count or after a short survey. See testing for commercial buildings.
Are you registered?
NAPIT approved contractor working to BS 7671 18th Edition, TrustMark 4025929. Work is notified under Part P where required. We guarantee our workmanship on fixed electrical work for 6 years (see the terms). The EICR test itself is not covered by that guarantee. This guarantee is our own, not insured, and does not affect your legal rights.
Can tenants call you in an emergency?
Yes, any day. Emergency call-outs are from £144 inc VAT, and outside our opening hours they're at a higher rate. You'll be told before anything beyond making the property safe. More on our emergency electrician call-outs in Sheffield.
Managing properties for clients? See EICRs for letting agents.
