Skip to content
NAPIT Approved · TrustMark 4025929 · 4.9 from 63 Google reviews (opens in a new tab) Same-working-day reply · No power? 07305 434759
M.A Electrical Contractor

Commercial EICR and fixed wire testing in Sheffield Every building.
One schedule.

Your first site tested within 10 working days of approval. Each site's report pack and fixed remedial quote within 5 working days of the visit. One direct contact: the owner, not a helpdesk.

Check us before you book

6-year guaranteeOn fixed electrical work
Fully insured£5m public liability · certificate on request

Published rate.

Budget before you speak to anyone.

  • From £20Per circuit, ex VAT. £250 minimum per site visit.
  • 10 daysFirst site tested from your approval.
  • 5 daysReport pack and fixed remedial quote per site, or 10% off that site's testing.
Send your sites

Rather talk first? Book a 5-minute call with Mo

  1. 01

    All sites, boards and due dates in one plan.

  2. 02

    First site tested within 10 working days of approval.

  3. 03

    Report pack and fixed remedial quote within 5 working days of each site visit.

  4. 04

    One direct contact: the owner, not a helpdesk.

  1. 05

    Every building.
    One schedule.

From £20Per circuit, ex VAT
£250Minimum per site visit
10 daysFirst site tested
5 daysReport pack per site
Sound familiar?

A dozen buildings. Three contractors.
No single answer.

Test dates all over the place

Different buildings, different due dates, reports in different formats. We put every site, board and due date into one schedule and stagger the testing so the cost spreads across the cycle.

Weeks waiting for the report

Then another wait for a remedial price. You get the commercial EICR, a photo log and a fixed remedial quote together, within 5 working days of the visit.

No price without a sales call

Our rate is on this page: from £20 per circuit, £250 minimum per site visit, ex VAT. Budget before you speak to anyone.

Report pack and fixed remedial quote within 5 working days of each site visit, or 10% off that site's testing invoice.

We guarantee speed and paperwork, not a pass. No honest contractor can promise the result before testing.

How it works

From site list
to report pack.

  1. Send your sites.Postcodes, rough board and circuit counts if you have them, and any deadline. "Don't know" is a fine answer.
  2. Get a schedule and a price.One plan for every building, priced at the published rate. Out-of-hours by arrangement, at a higher rate.
  3. First site in 10 working days.From your approval. C1 dangers are made safe or isolated before we leave.
  4. Report pack in 5 working days.Commercial EICR to BS 7671, photo log and a fixed remedial quote for each site. Approve, and we fix.
What you get

One accountable
contractor.

  • ✓Estate schedule: all sites, boards and due dates in one plan, testing staggered across the cycle.
  • ✓Commercial EICR per site to BS 7671, out-of-hours by arrangement at a higher rate.
  • ✓Report pack per site: commercial EICR, photo log and fixed-price remedial quote.
  • ✓Dangers dealt with on the day: C1 items made safe or isolated before we leave.
  • ✓Emergency lighting installation and testing, from £216 inc VAT.
  • ✓Remedials, maintenance and fit-outs: fixed quotes for defined work.
  • ✓One direct contact: the owner's line and email. No ticket number.
  • ✓6-year workmanship guarantee on every remedial we carry out.
Published rate

Commercial EICR cost: from £20 per circuit.
Worked out for you.

Guide price examples. Testing prices exclude VAT (VAT at 20% is added). £250 minimum per site visit. Guide prices: the price is agreed with you before work starts.
Example siteGuide price
Small shop or office, 10 circuitsFrom £250 ex VATThe minimum visit
Medium site, 30 circuitsFrom £600 ex VAT30 × £20
Larger or multi-board site, 60 circuitsFrom £1,200 ex VAT60 × £20
RemedialsFixed quoteIn the report pack, before any work starts
Emergency lighting install and testingFrom £216 inc VAT
3-phase installation and testingSee industrial electrical contractors in SheffieldFrom £300 inc VAT
Out-of-hours testingBy arrangement, at a higher ratePriced in your schedule before you commit

Don't know your circuit count? Tell us the number of boards, or send a photo of each board, and we'll estimate before you commit. Guide prices: the price is agreed with you before work starts.

Where we work · Proof

Sheffield and nearby.
Rated 4.9 on Google.

Any site in Sheffield, from one upward. In Rotherham, Barnsley and Chesterfield we book days of 3 or more sites. Elsewhere in the UK, programmes of £2,000 ex VAT or more per trip, with travel and accommodation at cost.

4.9★

From 63 Google reviews

Read them on Google →

NAPIT

Approved contractor

NAPIT and TrustMark (4025929). Working to BS 7671 18th Edition. Work notified under Part P where required.

Insured

Certificates on request

Fully insured: £5m public liability. We send our insurance certificate and our NAPIT and TrustMark details before you instruct us.

FuseBox 3-phase distribution board installed by M.A Electrical
Our work A 3-phase board we installed 1 Main switch (4-pole) · 2 Surge protection · 3 Neutral bar · 4 Earth bar · 5 Outgoing circuits
One of the M.A Electrical team fitting out a shopping-centre unit
Our work Fitting out a shopping-centre unit

More real jobs: our electrical projects in Sheffield.

Request a site testing quote

Tell us
about the sites.

Rough numbers are fine. If you don't know the circuit count, tick the box and we'll work it out.

  1. We reply the same working day.A schedule and a price from £20 per circuit.
  2. You approve.Your first site is tested within 10 working days.
  3. Report packs followwithin 5 working days of each visit.

Rather talk first? Pick a time and Mo will ring you on the number you give.

Book a 5-minute call with Mo →

Opens our booking page on cal.com in a new tab. How we use your details

What needs testing?
Your details

An email or a phone number is fine. We only need one.

Your properties
We fix within this on the day. Set 0 to approve everything first.

Sheffield and nearby. In Rotherham, Barnsley and Chesterfield we book days of 3 or more properties.

Your sites

Sheffield and nearby. In Rotherham, Barnsley and Chesterfield we book days of 3 or more sites.

Out-of-hours testing needed?
Anything else

We use your details to reply to your enquiry and, if you go ahead, to quote and do the work. See our privacy notice for how we use and keep your details, and your rights.

After your job we’ll message you once, and remind you once, to ask for a Google review. Tell us when you book, or reply “no thanks”, if you’d rather not.

Questions property managers ask

Straight answers.

Are you CHAS, SafeContractor or Constructionline accredited?

Not at the moment. We're NAPIT Approved, TrustMark registered and fully insured (£5m public liability). We can send our NAPIT and TrustMark details and our insurance certificate before you instruct us, and our 63 Google reviews are public.

Aren't you too small for our estate?

Start with your three nearest sites. You'll have the report packs within 5 working days of each visit, and you can judge us on those before adding the rest.

We already have a contractor.

Keep them. Send us the sites that are overdue or the hardest to schedule, and judge us on those report packs before moving anything else.

Can you test out of hours?

Yes, by arrangement and at a higher rate, so trading and tenants aren't disrupted. We'll agree the times and the price in the schedule before you commit.

Do you cover sites in other regions?

Yes, for programmes of £2,000 ex VAT or more per trip, with travel and accommodation at cost. Smaller jobs: anywhere in Sheffield, and in Rotherham, Barnsley and Chesterfield when 3 or more sites are booked for the same day.

What counts as a circuit, and what if I don't know how many?

Each protective device on a distribution board (each breaker or fuse) is usually one circuit. Send the number of boards or a photo of each, and we'll estimate the count and price before you commit.

What do you do if you find something dangerous?

C1 (danger present) items are made safe or isolated before we leave, and we tell you the same day. Everything else goes into the fixed remedial quote. What each code means: EICR codes C1, C2, C3 and FI explained.

Every building
on one schedule.

Letting agent or portfolio landlord? See EICRs for letting agents.

Renting out a house, flat or HMO? See landlord electrical safety certificates.

Industrial site, 3-phase supply or distribution boards? See industrial electrical contractors in Sheffield.

Testing a home or a flat? See EICR in Sheffield.

Call Quote FAQ